awards
dRMM's Tustin Estate first phase shortlisted for Inside Housing Development Award
The 167-home first phase of Southwark's Tustin Estate regeneration, designed by dRMM with Adam Khan Architects, JA Projects and Exterior Architecture, is up for a regeneration award on 24 November.

The first phase of the Tustin Estate regeneration in Southwark has been shortlisted for Best regeneration project – 21M+ London and South East at the 2026 Inside Housing Development Awards, architect dRMM said on 16 November.
The shortlisting recognises Phase One of the scheme, which dRMM designed with Adam Khan Architects, JA Projects and Exterior Architecture. According to the practice, the phase has created 167 new homes for existing residents.
Southwark Council, which the awards organiser names as the entrant, says the 167 homes comprise 157 council homes and 10 affordable homes. Winners will be announced at the awards ceremony on 24 November 2026 at the InterContinental O2, London.
dRMM said residents' priorities guided decisions throughout the project, from the overall approach to redevelopment to the design of homes and shared spaces. The practice said it was pleased to see the project shortlisted and grateful to the residents, Southwark Council, Bouygues and the wider design team for their collaboration.
The category
The category, sponsored by Venn, has six entries. Alongside Tustin Estate the shortlist includes Goldfinch Point, London (Anchor); Wimbourne Street, London (Higgins Partnership and Hackney Council); Lakes Estate regeneration (Milton Keynes City Council); One Clapham, London (Peabody); and Peel (North West Quarter) (Vistry, London Borough of Brent, Home Group and Child Graddon Lewis).
The organiser's shortlist lists the Tustin entry as "Tustin Estate regeneration phase 1 – Southwark Council" and does not name the design team.
The masterplan
According to dRMM's project page, the existing estate comprised 299 homes in three towers and six low-rise blocks. The practice says a resident ballot was held in February 2021 owing to the bad state of repair of the homes. Southwark Council says the most popular option in that ballot was to demolish and rebuild the low-rise homes.
dRMM says the masterplan provides 690 homes; Southwark Council puts the figure at nearly 700. The practice says the plan builds on the estate's green character, with an enlarged and enhanced Tustin Common providing a framed centrepiece at the heart of the estate, and new routes and play spaces planned as part of the wider regeneration.
A remodelled primary school, positioned as a pavilion in a central garden, will serve as the centrepiece of the estate, dRMM says. Exterior Architecture is listed as landscape architect on the project page.
When the practice announced the commission in 2021, Alex de Rijke, founding director of dRMM, said: "The Tustin Estate reconstruction is an important project for Southwark Council, the residents, and for dRMM." The wider project team at that stage included Beyond the Box, Greengage, Heyne Tillett Steel and Loop Engineering.
What happens next
Southwark Council says early works for Phase 2 of the estate renewal started in January 2026. The awards ceremony takes place on 24 November.
On the record: Milton Keynes City Council
Sources
- dRMM (opens in a new tab) (accessed 2026-11-16)
- Inside Housing Development Awards (opens in a new tab) (accessed 2026-11-16)
- dRMM (opens in a new tab) (accessed 2026-11-16)
- dRMM (opens in a new tab) (accessed 2026-11-16)
- Southwark Council (opens in a new tab) (accessed 2026-11-16)
This story was researched from the primary sources above and checked against them before publication. Spotted an error? Tell us and we will correct it promptly.